With Bayshore, a hall bathroom that keeps the tub runs $17,000–$21,000, a tub-to-shower conversion $23,000–$28,000, and a primary bathroom $32,000–$45,000. Those prices are for the work; tile, vanity and fixtures are your selections or can be supplied by you. Once work starts, most bathrooms take 3 to 4 weeks on site.
Most people want two things answered before they call anyone: what’s this going to cost, and how do I know the contractor is legit. This covers both, using our real pricing.

What each type of bathroom costs with us
| Bathroom | What’s typically included | Price |
|---|---|---|
| Hall bath, keep the tub | Tub stays; new tile surround with waterproofing, vanity, toilet, floor, lighting | From $17,000 (no shower glass) if you supply tile and fixtures; most around $21,000 if we supply them |
| Tub-to-shower conversion | Tub out; new waterproofed walk-in shower with glass | $23,000–$28,000 |
| Primary bathroom | Large walk-in shower, double vanity, glass enclosure, tile throughout | $32,000–$45,000 |
Tile, vanity, toilet, faucets, lighting and mirror are your selections. You can buy them yourself, or we supply them, usually through written allowances. Your estimate should say which, because it changes the number. For a line-by-line breakdown of a hall bath and a tub-to-shower conversion, see how much a hall bathroom remodel costs.
What pushes a bathroom price up
- Moving plumbing. Relocating the toilet, drain or shower valve means cutting the slab on most Pinellas homes.
- A curbless shower. The slab has to be recessed so the floor can slope to the drain without a step. Usually a few thousand dollars more.
- New circuits and vent fans. A lighted mirror, heated floor or a fan where there wasn’t one all need electrical work.
- Large-format or patterned tile. More labor, more waste, more prep to get the walls and floor flat enough.
- What’s behind the walls. Rotted framing or old water damage found at demolition. A good estimate tells you up front how that would be priced if it turns up.
- Permitted work has to meet current code, which can add items an old bathroom never had.
What keeps it down
- Keeping the tub, toilet and vanity where they are.
- Simple tile in a straight layout.
- Supplying your own fixtures, as long as they’re on site before the trades need them. See our bathroom remodel guide for the planning steps.

Is a full remodel what you need?
Not always. If the tile is sound and only the grout is stained, regrouting may be enough. If the vanity is the only thing you dislike, replacing it is a plumber’s job, not a remodel. If the shower leaks, have it diagnosed before deciding on scope. We’d rather tell you a smaller job will do than sell you a bathroom you don’t need.
What a contractor’s license tells you
In Florida, a licensed contractor has met state requirements for experience, examination and insurance, and the license is public, so you can check it yourself. It tells you who is legally responsible for the work. It doesn’t guarantee a perfect job, and it doesn’t replace comparing scope, references and the written contract.
How to check a license
- Ask for the license number and the exact company name on the contract.
- Look it up using the Florida DBPR guidance and license search. Check that it’s current and that the name matches.
- Ask for certificates of insurance (general liability and workers’ compensation or a valid exemption).
Ours is CRC1335471. Feel free to look us up the same way.

Questions that tell you more than the total
- Which waterproofing system will you use in the shower, and is the pan tested before tile?
- Who obtains any permits, and how do inspections affect the schedule?
- Which materials are included, which are allowances, and what are the allowance amounts?
- What happens, and how is it priced, if you find damage behind the walls?
- What are the written warranty terms and exclusions?
A lower quote isn’t automatically worse work; it may cover a different scope. These answers are how you find out.

Frequently asked questions
How long does a bathroom remodel take?
Most take 3 to 4 weeks on site, after selections are made and materials are on hand. See how long a bathroom remodel takes.
Do I need a permit to remodel a bathroom?
It depends on the work and your jurisdiction. Plumbing and electrical changes commonly require permits. Have your contractor confirm with the building department for your address and put it in the proposal.
Can I stay in the house during a bathroom remodel?
Usually, yes, if you have another bathroom to use.
We remodel bathrooms across Pinellas, including Clearwater, Belleair, Seminole, Indian Rocks Beach, Dunedin and Palm Harbor. Converting a tub? See tub-to-shower conversion. To get your own bathroom priced, book a free consultation or see our bathroom remodeling page.