★ 5.0 from 89 Google reviews|Licensed CRC1335471
Services Portfolio About Blog FAQ Schedule a Free Consultation
Why You Should Always Have Your Kitchen Remodel Performed by a Licensed Contractor

Why You Should Always Have Your Kitchen Remodel Performed by a Licensed Contractor

Home โ€บ Blog โ€บ Kitchen Remodeling โ€บ Why You Should Always Have Your…

Hiring a licensed contractor for a kitchen remodel matters because a kitchen touches plumbing, electrical, cabinets, stone and usually a permit, and when something goes wrong you want one company that’s legally responsible for all of it. But a license is the starting line, not the finish. Plenty of licensed contractors are a bad fit for a particular kitchen, and two licensed contractors can hand you quotes $20,000 apart for what sounds like the same job. Here’s how to check the license in a couple of minutes, and then how to tell what you’re actually being offered.

Coastal kitchen with aqua accents, Tampa Bay beach home remodel

Checking the license (the easy part)

  1. Get the license number and the company name exactly as it’ll appear on the contract.
  2. Look it up through Florida DBPR’s construction licensing information. Make sure it’s active and the name matches.
  3. Ask for proof of general liability insurance and workers’ comp (or a valid exemption).

Ours is CRC1335471, if you want to practice on us.

One thing people miss: a kitchen usually involves a plumber and an electrician too. Ask who those trades are and whether they’re licensed for their part of the work.

What It Costs With Bayshore

Kitchen remodels at Bayshore start at $28,000. Most full kitchens run $36,000–$50,000, and semi-custom or custom kitchens with layout changes run $50,000–$85,000 and up. Cabinets and countertops are included in those ranges, every kitchen gets a 3D rendering, and time on site runs 3 to 10 weeks depending on size.

Kitchen remodel pricing →Could refinishing or refacing do it? →

Typical ranges from our recent projects. Your written estimate, built after we see your space, is what your project is priced on.

What a good kitchen estimate should spell out

This is where the real comparison happens. A one-line “kitchen remodel: $42,000” tells you almost nothing. Look for:

  • Cabinets: brand or line, construction (plywood or particleboard boxes), door style, and whether crown, light rail and panels are included.
  • Countertops: material, edge, and how many cutouts (sink, cooktop). Is the backsplash included, and to what height?
  • Flooring: is it in or out? If the cabinet footprint changes, who deals with the gap?
  • Plumbing and electrical: reconnecting the existing sink is very different from moving it. Same for adding outlets, lighting or a dedicated circuit.
  • What’s yours to buy: appliances, light fixtures, faucets. With us those are your selections; some contractors include them, some don’t. That alone can explain a big price difference.
  • Permits and inspections: who pulls them and how they fit in the schedule.
  • What happens if you find damage behind the old cabinets, and how that would be priced.

For reference, our numbers

Small kitchens run $28,000–$36,000 (new cabinets, base-level quartz, backsplash and lighting in the existing layout), full kitchens $36,000–$50,000 (adds flooring), and semi-custom to custom $50,000–$85,000+. Appliances, light fixtures and faucets are separate. On site it’s 3 to 5 weeks for a small kitchen, 4 to 6 for a full one and 6 to 10 for custom. More detail in what a kitchen remodel costs.

White and natural shaker kitchen remodel with brass details, Pinellas
A permitted Bayshore kitchen remodel.

If someone comes in well under that for the same scope, don’t assume they’re cutting corners. Ask what’s different. Often it’s appliances included or excluded, a different cabinet line, or the floor not being touched.

Red flags worth walking away from

  • No license number, or a number that belongs to a different company.
  • A big deposit before anything is ordered or scheduled.
  • “We don’t need a permit for that” on work that clearly moves plumbing or adds circuits.
  • Pressure to sign today.
  • Nobody can tell you who will actually be in your house each day.

Questions to ask in the first meeting

  • How many kitchens like mine have you done in the last year? Can I see photos?
  • Who’s my point of contact during the job?
  • Which trades do you use, and how long have you worked with them?
  • What does the payment schedule look like, and what triggers each payment?
  • What will I be without, and for how long? (Sink, stove, fridge.)

If the kitchen is part of something bigger

If you’re also thinking about floors, a bathroom or paint, say so in the first meeting. A kitchen planned alone and then “added onto” usually costs more than the same work planned together, because flooring and paint get done twice. See whole-home remodeling for how we plan multi-room projects.

We remodel kitchens across Pinellas, including Clearwater, Belleair, Seminole, Indian Rocks Beach and Dunedin. If you’d like a written quote you can compare line by line, book a free consultation. And if you want to bring someone else’s estimate to that meeting, we’re happy to walk through it with you.

Share this article
Call (813) 489-1552Get My Price